There are many in's and out's to the chart wizard, hence not all of the details are documented here. What is included is the information on how to do specific things, e.g. Edit the chart title, add a label to an axis and change the font of these or change the dates included in the series of data displayed.
Graph Section
Each of the sections displayed in the Construction and Presentation pane can be edited in the Chart Wizard. The table below show where to go within the Chart wizard to change specific things.
|
What to change
|
Where to get to it
The first option on bold e.g. Go to Axes is selcted from the Construction/Presentation pane, any subsequent options are selected from the Properties pane discussed below.
|
Add chart title and change font
|
Go to Chart Titles > Text tab
-
Type into the text box that by default displays the text " Chart. This should automatically update the title displayed in the Graph Preview
-
Click General tab > Font to change the titles font
-
Click Add to add a second title to the chart (and Remove to delete it)
|
Add an axis title and change font
|
Go to Axes > Elements
-
Select the Axis required for editing from the dropdown at the top
-
-
-
-
Edit the Text box as required
|
Change the dates used for the data displayed
|
Go to Axes > General tab > Range
-
Dates should appear on the Primary AxisX
-
-
Change the Min / Max dates as required. Leave the time portion of the date as it defaults in
|
Change the Legend font
|
Go to Legend > Text
|
Change the way a series is plotted e.g for a line graph
|
Go to Series Views > Appearance
|
|
Change the minimum weight used for the data displayed
|
Go to Axes > General tab > Range
At the top change the drop down to Primary AxisY as this is the vertical axis and should display the weight details against it.
Untick Auto
Change the Min weight to that required
|
|
Graph Preview
A preview of the graph updated as changes are made.
|
Properties
The Properties or options that can be changed about each part of the graph are changed in this section of the Chart Wizard. There are two sets of tabs - ones on the right-hand side and ones at the top. When navigating around choose a tab from the right-hand side first followed by one at the top.
|
Previous and Next
Used to navigate through each section of the Chart Wizard. These can be over ridden by choosing a section from the Construction/Presentation pane of the Wizard.
|
Cancel
Cancels any changes made.
|
Finish
Saves any changes made and displays them in the Chart tab in Client Details.
|